|
82.
|
|
|
Select the manufacturing resource (previously defined) where you want to execute the operation. For the product costing, the Resource rate is taken from the cost element introduced in the window Product Costing.
|
|
|
Version: 3.6.0LTS.
|
|
|
|
(no translation yet)
|
|
Translated and reviewed by
Robin
|
|
|
|
Located in
Content of: id-53375:Help.
|
|
88.
|
|
|
The Valid From date indicates the first day of a date range.
When you enter dates in the fields Valid From - To we give the the period of time where this operation will have to be considered for the elaboration of the product.
|
|
|
Version: 3.6.0LTS.
|
|
|
represents a line break.
Start a new line in the equivalent position in the translation.
|
|
|
|
(no translation yet)
|
|
Translated and reviewed by
Robin
|
|
|
|
Located in
Content of: id-53380:Help.
|
|
91.
|
|
|
The Valid To date indicates the last day of a date range
When you enter dates in the fields Valid From - To we give the the period of time where this operation will have to be considered for the elaboration of the product.
|
|
|
Version: 3.6.0LTS.
|
|
|
represents a line break.
Start a new line in the equivalent position in the translation.
|
|
|
|
(no translation yet)
|
|
Translated and reviewed by
Robin
|
|
|
|
Located in
Content of: id-53381:Help.
|
|
95.
|
|
|
Copy BOM Lines from an exising BOM. The BOM being copied to, must not have any existing BOM Lines.
|
|
|
Version: 3.6.0LTS.
|
|
|
|
(no translation yet)
|
|
Translated and reviewed by
Robin
|
|
|
|
Located in
Content of: id-53480:Help,id-58101:Help.
|
|
96.
|
|
|
The Valid From date indicates the first day of a date range
The Valid From and Valid To dates indicate the valid time period to use the BOM in a Manufacturing Order.
|
|
|
Version: 3.6.0LTS.
|
|
|
represents a line break.
Start a new line in the equivalent position in the translation.
|
|
|
|
(no translation yet)
|
|
Translated and reviewed by
Robin
|
|
|
|
Located in
Content of: id-53490:Help,id-58114:Help.
|
|
100.
|
|
|
A manufacturing resource is a place where a product will be made.
|
|
|
Version: 3.6.0LTS.
|
|
|
|
(no translation yet)
|
|
Translated and reviewed by
Robin
|
|
|
|
Located in
Content of: id-53513:Help.
|
|
102.
|
|
|
The name BOM/Formula that you introduce in this window will be considered the default BOM to produce the product in this Organization-Plant-Warehouse. If you do not fill this field the default BOM & Formula for the entity will be the BOM/Formula which has the same name as the product.
|
|
|
Version: 3.6.0LTS.
|
|
|
|
(no translation yet)
|
|
Translated and reviewed by
Robin
|
|
|
|
Located in
Content of: id-53517:Help.
|
|
104.
|
|
|
The Workflow field identifies a unique Workflow in the system.
The Workflow you introduce in this window will be considered the default Workflow to produce the product in this Organization-Plant-Warehouse. If you do not fill this field the defaul Workflow for the entity will be the Workflow with the same name as the product.
|
|
|
Version: 3.6.0LTS.
|
|
|
represents a line break.
Start a new line in the equivalent position in the translation.
|
|
|
|
(no translation yet)
|
|
Translated and reviewed by
Robin
|
|
|
|
Located in
Content of: id-53518:Help.
|
|
107.
|
|
|
The Promised Delivery Time indicates the number of days between the order date and the date that delivery was promised.
You must enter the average number of days to receive the product in the warehouse since you approve the requisition or manufacturing order until you receive the material in the warehouse . If the product is bought you must register the calendar days required since you make the PO until you receive the material in the warehouse. If the product is manufactured in your plant you must register the number of working days since you release the MO until you receive the material in the warehouse.
|
|
|
Version: 3.6.0LTS.
|
|
|
represents a line break.
Start a new line in the equivalent position in the translation.
|
|
|
|
(no translation yet)
|
|
Translated and reviewed by
Robin
|
|
|
|
Located in
Content of: id-53523:Help.
|
|
110.
|
|
|
Amount of time the performer of the activity needs to perform the task in Duration Unit
In the field Working Time you enter the accumulated time (using the Promising Delivery Time) in the critical path of the BOM for this product. It is the required time to produce the product as if you would not have any component on hand.
|
|
|
Version: 3.6.0LTS.
|
|
|
represents a line break.
Start a new line in the equivalent position in the translation.
|
|
|
|
(no translation yet)
|
|
Translated and reviewed by
Robin
|
|
|
|
Located in
Content of: id-53533:Help.
|