Browsing Chinese (Simplified) translation

110 of 161 results
110.
Amount of time the performer of the activity needs to perform the task in Duration Unit

In the field Working Time you enter the accumulated time (using the Promising Delivery Time) in the critical path of the BOM for this product. It is the required time to produce the product as if you would not have any component on hand.
Version: 3.6.0LTS.
There are line breaks here. Each one represents a line break. Start a new line in the equivalent position in the translation.
(no translation yet)
Translated and reviewed by Robin
Located in Content of: id-53533:Help.
110 of 161 results

This translation is managed by Launchpad Simplified Chinese Translators, assigned by Launchpad Translators.

You are not logged in. Please log in to work on translations.