|
6.
|
|
|
Schedule project from start time: %1
|
|
|
|
Planlama projesi başlama zamanından itibaren:%1
|
|
Translated and reviewed by
Tolga ÖZDEMİR
|
|
|
|
Located in
KPlatoRCPSScheduler.cpp:211
|
|
7.
|
|
|
Schedule
|
|
|
|
Zamanlama
|
|
Translated and reviewed by
can kaçan
|
|
|
|
Located in
KPlatoRCPSScheduler.cpp:228
|
|
8.
|
|
|
Invalid scheduling solution. Result: %1
|
|
|
|
Geçersiz zamanlama çözümü.Sonuç: %1
|
|
Translated and reviewed by
Tolga ÖZDEMİR
|
|
|
|
Located in
KPlatoRCPSScheduler.cpp:237
|
|
9.
|
|
|
Scheduling backwards from target end time is not supported.
|
Context: |
|
@item:inlistbox
|
|
|
|
(no translation yet)
|
|
|
|
Located in
KPlatoRCPSPlugin.cpp:67
|
|
10.
|
|
|
The project will be scheduled forward from target start time.
|
Context: |
|
@item:inlistbox
|
|
|
|
Proje,hedef başlama zamanından geri zamanlanacaktır.
|
|
Translated and reviewed by
Tolga ÖZDEMİR
|
|
|
|
Located in
KPlatoRCPSPlugin.cpp:68
|
|
11.
|
|
|
Scheduling tasks with time constraints is not supported.
|
Context: |
|
@item:inlistbox
|
|
|
|
(no translation yet)
|
|
|
|
Located in
KPlatoRCPSPlugin.cpp:72
|
|
12.
|
|
|
Tasks will be scheduled As Soon As Possible (ASAP).
|
Context: |
|
@item:inlistbox
|
|
|
|
Görevler mümkün olan en kısa zamanda planlanacaktır.
|
|
Translated and reviewed by
Tolga ÖZDEMİR
|
|
|
|
Located in
KPlatoRCPSPlugin.cpp:73 KPlatoRCPSPlugin.cpp:78
|
|
13.
|
|
|
Scheduling tasks As Late As Possible (ALAP) is not supported.
|
Context: |
|
@item:inlistbox
|
|
|
|
(no translation yet)
|
|
|
|
Located in
KPlatoRCPSPlugin.cpp:77
|
|
14.
|
|
|
Task '%1' estimate: %2
|
|
|
|
Görev '%1' tahmini: %2
|
|
Translated by
cafer can
|
|
Reviewed by
Translate it
|
|
|
|
Located in
KPlatoRCPSScheduler.cpp:303
|
|
15.
|
|
|
Task '%1' duration called %2 times, cached values: %3
|
|
|
|
(no translation yet)
|
|
|
|
Located in
KPlatoRCPSScheduler.cpp:304
|