|
69.
|
|
|
Work Breakdown Structure Code
|
|
|
|
(no translation yet)
|
|
Translated and reviewed by
Paco Molinero
|
|
|
|
Located in
models/kptcommonstrings.cpp:35
|
|
141.
|
|
|
Controls resource overbooking when scheduling
|
|
|
|
(no translation yet)
|
|
Translated and reviewed by
Paco Molinero
|
|
|
|
Located in
models/kptcommonstrings.cpp:126
|
|
151.
|
|
|
<para>The scheduler used for calculating the project schedule.</para><para>The default built-in scheduler is the Network Scheduler.</para><para>Other schedulers presently available is RCPS if libRCPS is installed on your system. RCPS is a genetics based resource constrained project scheduler.</para>
|
Context: |
|
@info:whatsthis
|
|
|
|
(no translation yet)
|
|
Translated and reviewed by
Paco Molinero
|
|
|
|
Located in
models/kptcommonstrings.cpp:157
|
|
161.
|
|
|
The relations time lag
|
|
|
|
(no translation yet)
|
|
Translated and reviewed by
Paco Molinero
|
|
|
|
Located in
models/kptcommonstrings.cpp:173
|
|
423.
|
|
|
The Work Breakdown Structure introduces numbering for all tasks in the project, according to the task structure.
The WBS code is auto-generated.
You can define the WBS code pattern using the Define WBS Pattern command in the Tools menu.
|
|
|
represents a line break.
Start a new line in the equivalent position in the translation.
|
|
|
|
(no translation yet)
|
|
Translated and reviewed by
Paco Molinero
|
|
|
|
Located in
ui/kptsummarytaskgeneralpanel.cpp:53 ui/kptmainprojectpanel.cpp:49
ui/kpttaskgeneralpanel.cpp:56
|
|
538.
|
|
|
<title>Resource Editor</title><para>Resources are organized in a Resource Breakdown Structure. Resources can be of type <emphasis>Work</emphasis> or <emphasis>Material</emphasis>. When assigned to a task, a resource of type <emphasis>Work</emphasis> can affect the duration of the task, while a resource of type <emphasis>Material</emphasis> does not. A resource must refer to a <emphasis>Calendar</emphasis> that defines the working hours.</para>
|
Context: |
|
@info:whatsthis
|
|
|
|
(no translation yet)
|
|
Translated and reviewed by
Paco Molinero
|
|
|
|
Located in
ui/kptresourceeditor.cpp:125
|
|
539.
|
|
|
Add Resource Group...
|
|
|
|
(no translation yet)
|
|
Translated and reviewed by
Paco Molinero
|
|
|
|
Located in
ui/kptresourceeditor.cpp:266
|
|
546.
|
|
|
Delete Selected Accounts
|
|
|
|
(no translation yet)
|
|
Translated and reviewed by
Paco Molinero
|
|
|
|
Located in
ui/kptaccountseditor.cpp:234
|
|
565.
|
|
|
<title>Work & Vacation Editor</title><para>A calendar defines availability for resources or tasks of type <emphasis>Duration</emphasis>. A calendar can be specific to a resource or task, or shared by multiple resources or tasks. A day can be of type <emphasis>Undefined</emphasis>, <emphasis>Non-working day</emphasis> or <emphasis>Working day</emphasis>. A working day has one or more work intervals defined. A calendar can have sub calendars. If a day is undefined in a calendar, the parent calendar is checked. An <emphasis>Undefined</emphasis> day defaults to <emphasis>Non-working</emphasis> if used by a resource, or <emphasis>available all day</emphasis> if used by a task. </para>
|
Context: |
|
@info:whatsthis
|
|
|
|
(no translation yet)
|
|
Translated and reviewed by
Paco Molinero
|
|
|
|
Located in
ui/kptcalendareditor.cpp:394
|
|
568.
|
|
|
Delete Selected Calendar
|
|
|
|
(no translation yet)
|
|
Translated and reviewed by
Paco Molinero
|
|
|
|
Located in
ui/kptcalendareditor.cpp:626
|