|
1.
|
|
|
Routing Work Centers
|
|
|
module: mrp
|
|
|
|
Resursu maršrutēšana
|
|
Translated by
Christophe Simonis (OpenERP)
|
|
|
|
Located in
view:mrp.routing.workcenter:0
|
|
2.
|
|
|
Manufacturing Orders are usually proposed automatically by OpenERP based on the bill of materials and the procurement rules, but you can also create manufacturing orders manually. OpenERP will handle the consumption of the raw materials (stock decrease) and the production of the finished products (stock increase) when the order is processed.
|
|
|
module: mrp
|
|
|
|
(no translation yet)
|
|
|
|
Located in
model:ir.actions.act_window,help:mrp.mrp_production_action
|
|
3.
|
|
|
Location where the system will look for components.
|
|
|
module: mrp
|
|
|
|
Vieta, kur sistēma meklēs izejvielas.
|
|
Translated by
Christophe Simonis (OpenERP)
|
|
|
|
Located in
help:mrp.production,location_src_id:0
|
|
4.
|
|
|
Work Centers Utilisation
|
|
|
module: mrp
|
|
|
|
Resursu utilizācija
|
|
Translated by
Christophe Simonis (OpenERP)
|
|
|
|
Located in
field:mrp.production,workcenter_lines:0
|
|
5.
|
|
|
Sugar
|
|
|
module: mrp
|
|
|
|
(no translation yet)
|
|
|
|
Located in
model:product.template,name:mrp.product_sugar_product_template
|
|
6.
|
|
|
No. Of Cycles
|
|
|
module: mrp
|
|
|
|
Ciklu skaits
|
|
Translated by
Christophe Simonis (OpenERP)
|
|
|
|
Located in
report:mrp.production.order:0
|
|
7.
|
|
|
Number of Cycles
|
|
|
module: mrp
|
|
|
|
Ciklu skaits
|
|
Translated by
Christophe Simonis (OpenERP)
|
|
|
|
Located in
field:mrp.routing.workcenter,cycle_nbr:0
|
|
8.
|
|
|
Fluid
|
|
|
module: mrp
|
|
|
|
Šķidrums
|
|
Translated by
Maxime Chambreuil (http://www.savoirfairelinux.com)
|
|
|
|
Located in
model:product.uom.categ,name:mrp.product_uom_categ_fluid
|
|
9.
|
|
|
The 'Minimum stock rule' allows the system to create procurement orders automatically as soon as the minimum stock is reached.
|
|
|
module: mrp
|
|
|
|
"Minimālo atlikumu nosacījumi" ļauj sistēmai veidot iepirkumu pasūtījumus automātiski, tiklīdz tiek sasniegts preču minimālais atlikums.
|
|
Translated by
Christophe Simonis (OpenERP)
|
|
|
|
Located in
model:process.transition,note:mrp.process_transition_minimumstockprocure0
|
|
10.
|
|
|
Picking list
|
|
|
module: mrp
|
|
|
|
(no translation yet)
|
|
|
|
Located in
field:mrp.production,picking_id:0
|