Browsing Hungarian translation

Don't show this notice anymore
Before translating, be sure to go through Launchpad Translators instructions and Hungarian guidelines.
6978 of 128 results
69.
Setup Material Requirement Planning
Version: 3.6.0LTS.
(no translation yet)
Located in Content of: id-50009:Description,id-50015:Description,id-50019:Description.
70.
Capacity Requirement Planning Setup
Version: 3.6.0LTS.
(no translation yet)
Located in Content of: id-50010:Name.
71.
Setup Capacity Requirement Planning
Version: 3.6.0LTS.
(no translation yet)
Located in Content of: id-50010:Description.
72.
Forecast
Version: 3.6.0LTS.
Előrejelzés
Translated and reviewed by Tamás Németh
Located in Content of: id-50011:Name,id-50011:Description.
73.
Manufacturing Management Setup
Version: 3.6.0LTS.
(no translation yet)
Located in Content of: id-50012:Name,id-50020:Name.
74.
MRP is a set of techniques which uses Bills of Material, Inventory Data, and the Master Production Schedule to calculate requirements for materials.
Version: 3.6.0LTS.
(no translation yet)
Located in Content of: id-50012:Description,id-50013:Description,id-50014:Description,id-50053:Description,id-50054:Description,id-50055:Description,id-50056:Description.
75.
Notice
Version: 3.6.0LTS.
(no translation yet)
Located in Content of: id-50013:Name.
76.
Calculate Capacity Plan
Version: 3.6.0LTS.
(no translation yet)
Located in Content of: id-50017:Name,id-50017:Description.
77.
Resource Load View
Version: 3.6.0LTS.
(no translation yet)
Located in Content of: id-50018:Name.
78.
It shows graphically of the required and available time for each manufacturing resource.
Version: 3.6.0LTS.
(no translation yet)
Located in Content of: id-50018:Description.
6978 of 128 results

This translation is managed by Launchpad Hungarian Translators, assigned by Launchpad Translators.

You are not logged in. Please log in to work on translations.

Contributors to this translation: Tamás Németh.