Browsing Russian translation

Don't show this notice anymore
Before translating, be sure to go through Launchpad Translators instructions and Russian guidelines.
6776 of 86 results
67.
Show the detail of MRP calculation
Version: 3.6.0LTS.
Показать детальный расчет потребности в материалах
Translated and reviewed by rsashka
Located in Content of: id-53003:Description,id-53003:Help.
68.
Planned Order Approval
Version: 3.6.0LTS.
There are leading/trailing spaces here. Each one represents a space character. Enter a space in the equivalent position in the translation.
Подтверждение запланиорованного заказа
Translated and reviewed by rsashka
Located in Content of: id-53004:Name.
69.
A planned manufacturing order is a manufacturing order suggested by the MRP process and contains its quantity and its release and promise dates.
Version: 3.6.0LTS.
Запланированный заказ на производство это заказ на производство, предложенный процессом планирования продуктов и содержащий количество, и его дату выпуска и обещанную дату.
Translated and reviewed by rsashka
Located in Content of: id-53004:Description.
70.
A planned manufacturing order is a manufacturing order suggested by the MRP process and contains its quantity and its release and promise dates. when you approve a manufacturing planned order you convert it in a manufacturing order with the status of In Process.

When you approve a planned order you are telling the system that the manufacturing order is ready to start its process with the approval you change the order status from Draft to In Process.
Version: 3.6.0LTS.
There are line breaks here. Each one represents a line break. Start a new line in the equivalent position in the translation.
(no translation yet)
Translated and reviewed by PeanutBlake
Located in Content of: id-53004:Help.
71.
CRP Info
Version: 3.6.0LTS.
Информация о загрузке производства
Translated and reviewed by rsashka
Located in Content of: id-53005:Name.
72.
It shows graphically of the required and available time for each manufacturing resource.
Version: 3.6.0LTS.
Показывает на графике необходимые и доступные производственные мощности для каждого производственного ресурса.
Translated and reviewed by rsashka
Located in Content of: id-53005:Description,id-53005:Help,id-53006:Description,id-53006:Help.
73.
Resource Load View
Version: 3.6.0LTS.
Просмотр загрузки производственных ресурсов
Translated and reviewed by rsashka
Located in Content of: id-53006:Name.
74.
Order Receipt & Issue
Version: 3.6.0LTS.
Отпуск заказнных позиций
Translated and reviewed by rsashka
Located in Content of: id-53007:Name,id-53007:Description.
75.
The form shows at the upper side static information around the product and the manufacturing resource where it has to be made, it also shows a summary of the quantities to be controlled in the MO such as the Original and delivered quantities and the Quantity to deliver for the MO up to date.

If the production process requires production in batch, then the Qty Batchs shows the Number of batches the shop floor needs to do and the Qty Batch Size contains the size of every batch to be produced.


If you want to issue the MO components before you receive the finished product you should tick the checkbox Is Delivery, this case is recommended when you have a long to medium lead time and you want to have the inventory quantities as reliable as possible at every moment.

If you have small lead time and you wish to save clerk time then you must tick Is Backflush checkbox and you will receive the finished product at the same time you issue automatically the components

The Backflush Group field is used when you want to issue just components belonging to this group. (This characteristic could not be included in the current version).

At the lower part of the window you can find the list of every MO component, this can be modified according with the real products and quantities given to the shop floor.

The quantities to be issued are selected with the checkbox at the first column of the list of components. If the actual quantity is different from the standard quantity showed in the column Qty to deliver you should edit this field to enter the right quantity to be issued.

Finally a message box asks if you want to close the OM document, you should click the ok button if this MO does not have any more transactions and has to be closed.

Version: 3.6.0LTS.
There are line breaks here. Each one represents a line break. Start a new line in the equivalent position in the translation.
(no translation yet)
Translated and reviewed by PeanutBlake
Located in Content of: id-53007:Help.
76.
Generate Movement Manual
Version: 3.6.0LTS.
Создать перемещение(в ручную)
Translated and reviewed by rsashka
Located in Content of: id-53008:Name.
6776 of 86 results

This translation is managed by Russian Launchpad Translators, assigned by Launchpad Translators.

You are not logged in. Please log in to work on translations.

Contributors to this translation: PeanutBlake, Savrasov, rsashka.